Learn More About Our History and Commitment to the Community

About Us

The Riverview Bluffs Condominiums is located high on the bluffs of Bullhead City, Arizona, overlooking the Colorado River with the casinos of Laughlin, Nevada, in the background. Our community has 108 units and is protected with a security entry system. The early 1990s saw the construction of this complex, which offers an ideal environment for Desert Living.

The complex was built in two phases, with Buildings 8 through 14 being built in the late 80s and the second phase of Buildings 3 through 7 being built in the early 90s.

Over the years, the Association has vigorously pursued keeping the complex in modern-day, state-of-the-art conditions. To mention just a few items, the following is a list of improvements that have taken place in our community:


  • All of the 12 buildings in the complex have been repainted. 


  • All of the underground water piping within the complex has been replaced. Although the system is owned and operated by EPCOR, the Association was instrumental in getting this work done, as the original system had a history of leakage. The current system now uses polyethylene pipe, which has a proven record of being very reliable.


  • To improve water conservation without degrading the esthetic value of the complex, a theme of "desert landscaping" was implemented This has led to a decrease in water usage and a significant reduction in landscape maintenance costs. Eliminating the need to water plants between the sidewalks and buildings has also reduced the possibility of water intrusion into the buildings.


  • The electronic and mechanical components of the entry gate have been upgraded to improve its reliability and minimize the effort required to enter and exit the complex.


  • We replaced the sprinkler heads for fire suppression in units 3 through 7 to improve the system's reliability. Only these units, built during the phase II construction, received this work. Buildings 8 through 14 do not have sprinkler heads, as they were built during the phase I construction when the fire code didn't require a fire suppression system.


  • We have replaced all the inlet water valves on each unit to ensure their reliability. The hard-water supply's internal corrosion rendered many of the valves inoperative, necessitating this replacement.


  • The upper pool was renovated and the pool decking was redone in 2024, and all carports were painted in 2024–2025.
Learn More